Skip to main content
Global Robot Index

Compare · Quadruped robots

D1 Pro vs D50WS vs D30WS

Every published value, side by side. Best value in lime. The link is shareable.

D1 Pro

AgiBot · China

D50WS

Linxai Robotics · China

D30WS

Linxai Robotics · China

The short answer

Based only on published, sourced data. A missing value never counts as a win.

No lead in published specs yet

Leads on 2 specs

Highest GRI score

Pick it for: Payload, Max step / obstacle height

Leads on 1 spec

Best documented

Pick it for: Battery runtime

Scores

GRI score
—
53.5
51.2
Capability
33
71
66
Deployment
98
50
50
Manufacturer
13
30
30
Export readiness
6
3
3

Inside the robot · Software, AI and hardware

What runs the robot, who can change it, and the key parts. Every line links to its source.

Can you change the code?SDK availableSDK availableClosedNo open source code mentioned; SDK provided

The brain

AI models—
  • 70 TOPS AI computing powerB ↗Compute capability specified, no specific model name given
—
Onboard computer—
  • Jetson Orin NX 8GBB ↗70 TOPS AI computing power; RK3588 also mentioned
  • RK3588 compute platformB ↗Mentioned in header alongside Jetson Orin NX
—
Operating system
  • LinuxB ↗maker docsLinux realtime kernel patch available
  • Ubuntu 22.04B ↗maker docsDocker packages are for ubuntu.22.04.
——

Software & developers

SDK / API
  • aimrl_sdkB ↗maker docsPython SDK for deploying motion-control inference.
  • Full SDKB ↗Standard interfaces and full SDK provided for development
  • LINXAI SDK V3.0.1 / V4.0.1B ↗Wheeled-Legged Robot SDK for secondary development
  • Full SDKB ↗Standard interfaces and full SDK provided for development
  • Complete SDK and development supportB ↗High-level and low-level development support
  • LINXAI SDK V3.0.1 / V4.0.1B ↗Wheeled-Legged Robot SDK for secondary development
Languages
  • C++B ↗maker docsprimary programming language used
  • PythonB ↗maker docssecondary programming language used
——
ROS support
  • ROS 2 HumbleB ↗maker docsSource script for ROS 2 humble setup is provided.
——
How you program it—
  • High-level and low-level developmentB ↗Supports both high-level and low-level development
  • API / Secondary developmentB ↗Supports secondary development with sample code and examples
  • API / Secondary developmentB ↗Supports secondary development with sample code and examples
Simulation
  • MuJoCoB ↗maker docsFramework performs mujoco sim2sim simulation debugging.
  • Isaac Gym, MuJoCoB ↗maker docsProprietary training platform supports these environments
  • Isaac Sim, GazeboB ↗Robot model and simulation interfaces provided
  • Robot model and simulation interfacesB ↗Provided for development support
  • Isaac Gym, MuJoCoB ↗maker docsProprietary training platform supports these environments

Hardware

Interfaces—
  • WiFi 6B ↗Standard connectivity interface listed
  • TCP / Fast DDS / ROSB ↗Communication via TCP, Fast DDS, or ROS topics
  • WiFi 6B ↗Standard connectivity interface listed
  • Standard 4G LTE connectivityB ↗Optional 5G/RTK/positioning modules available
  • TCP / Fast DDS / ROSB ↗Communication via TCP, Fast DDS, or ROS topics

Components layout

Specs grouped by where they sit on the robot.

Head & sensors—
  • Max slope45 °
  • Max slope45 °
Body
  • Battery runtime2 h
  • Payload5 kg
  • Weight15.5 kg
  • Battery runtime5.5 h
  • Payload100 kg
  • Weight79 kg
  • Battery runtime6 h
  • Payload40 kg
  • Weight42 kg
Legs—
  • Max speed5 m/s
  • Max step / obstacle height40 cm
  • Max speed5 m/s
  • Max step / obstacle height30 cm

Price & buying

Price bandnot publishednot publishednot published
StageCommercialCommercialCommercial
CategoryQuadruped robotsQuadruped robotsQuadruped robots

Specifications (9)

Payload
5 kg
100 kgBEST
40 kg
Battery runtime
2 h
5.5 h
6 hBEST
Weight
15.5 kg
79 kg
42 kg
Max speed
—
5 m/s
5 m/s
Max step / obstacle height
—
40 cmBEST
30 cm
Max slope
—
45 °
45 °
IP rating
—
IP67
IP66
peak joint torque nm
48 N·m
—
—
walking speed ms
3.5 m/s
—
—

Get quotes from all 3 makers

One request. We contact each maker and come back with price, lead time and export terms.

Request quotes →